Involved from concept through construction administration, GROTH Design Group has tied the new 30-person chapel into the architecture of the church.
Scroll
The challenge for site planning for St. Stephen was to fit extensive interior and exterior program requirements onto a 14 acre site. A portion of the site was not buildable due to the presence of wetlands. The site was also adjacent to a major interstate freeway, further restricting the placement of building components.
The building design has a contemporary architectural language that keeps with the suburban setting, while still recalling the form, materials, and details of the Parish’s existing historic church.
Completion
2009
Square Footage
27,400
Services
master planning
design development
consensus building
construction documents
full architecture
liturgical design
programming
schematic design
site analysis
site planning
Involved from concept through construction administration, GROTH Design Group has tied the new 30-person chapel into the architecture of the church.
The St. Paul Lutheran School project involves the expansion and remodeling of the existing gymnasium totals approximately 9,700 square feet.
Recognizing a need to accommodate their growth with a long-term vision, Lakeland engaged GROTH Design Group to develop a solution to expand their space.