Enhancing safety and security, learning and capacity, numerous improvements are planned for Cedarburg High School.
Scroll
The project involved the expansion and remodeling of the existing gymnasium. The remodeled area totals approximately 4,620 square feet. The area of new construction totals approximately 5,080 square feet. The building construction consists of concrete foundation walls and footings, concrete floor slab on grade with a wood athletic floor system, insulated precast concrete wall panels, steel joist and metal deck roof structure with rigid insulation and adhered membrane roofing.
Site work includes grading, new concrete walks, seeding of disturbed turf areas and landscaping.
Enhancing safety and security, learning and capacity, numerous improvements are planned for Cedarburg High School.
Trinity Lutheran Church engaged GROTH to create a master plan on their existing site to provide for expansion needs.
GROTH Design Group provided a layout for the school and church with additional, new programming for First Steps, an early childhood/day care.